Choosing a calculation method
Every step price uses one of two calculation methods. Both use the same tiers; they differ in how the total quantity is priced. The examples below use these tiers:- Flat Tier
- Cumulative
Clarus looks at the final total quantity, finds the one tier it falls into, and charges the whole quantity at that tier’s price.For a total of 25, the quantity falls into tier 3:
25 × £0.50 = £12.50This produces a single charge line.Setting up step pricing
1
Open the charge card
From the left-hand menu, go to Charges then Charge Card, and select the relevant charge card.
2
Add a charge price
In the Pick Prices or Rental Prices panel, click Add Line and fill in the Code, Name and any conditions as you would for any other charge price.
3
Set the price type to Step
In the Price Type column, select Step. The Quantity and Price fields become unavailable, because the prices now come from the tiers.Then choose the Unit of Measure — Storage Unit or Item.
Choose the price type before the unit of measure. Changing the Price Type clears the unit of measure, quantity and price on that row.
4
Open the step pricing configuration
Click Manage Steps on the row. This opens the Step Pricing Configuration window.
5
Choose the calculation method
Under Calculation Method, select Flat Tier or Cumulative (see Choosing a calculation method).
6
Add your tiers
Under Tiers and Prices, click Add Line for each tier and enter:
Click Save on each tier row.
7
Apply the configuration
Click Apply Configuration. Clarus sorts the tiers into order and saves them with the charge price.
Tier rules
Clarus checks the tiers when you save them and highlights anything it cannot accept:- Tiers cannot overlap. Both From and To are inclusive, so the next tier must start above the previous tier’s To. After a tier of 1–10, start the next tier at 11 (or 10.01 if you work in decimals) — not at 10.
- To must be greater than From.
- At least one tier is required before you can apply the configuration.
- A calculation method is required.
- Save every tier row before you click Apply Configuration.
Changing back to standard pricing
Once a charge price has been saved as Step, its Price Type cannot be changed. To go back to a fixed price, delete the row and add a new one with the Price Type set to Standard.How step pick charges are raised
Step pick charges are calculated per pick list:- While the pick list is being picked, no step charge line exists yet. Clarus records each pick.
- Once every pick task on the pick list is completed or cancelled, Clarus totals the quantity picked on that pick list and creates the charge lines using the calculation method.
- With a unit of measure of Item, the total is the number of items picked. With Storage Unit, it is the number of unique storage units picked.
- If a pick is later unpicked, the step charge lines for that pick list are removed. They are created again, from the up-to-date picked quantity, once the pick list is fully picked again.
- A pick list that is started in one charge window and finished in the next is charged as a whole, in the window it finishes.
Step pricing does not apply to cross docks.
How step rental charges are raised
- Flat Tier
- Cumulative
No rental charge lines are created during the charge window. When the charge window closes, Clarus creates one charge line for the step price, priced at the single tier matching the total for the window:
- Item — the total quantity of items rented during the window.
- Storage Unit — the number of unique storage units rented during the window.
Reviewing step charge lines
Step charge lines appear alongside your other charges and flow onto invoices in the normal way. Each line shows the billed quantity, unit of measure and price, and its description carries the tier and method used, for example:What happens if I change the tiers while charges are being raised?
What happens if I change the tiers while charges are being raised?
Clarus uses the configuration that is in place at the moment each charge line is created. Charge lines that have already been created are not recalculated. For flat-tier pick charges, for example, the tiers in place when the last pick task on the pick list is completed are the ones used.
Can I still use conditions such as storage unit type or product group?
Can I still use conditions such as storage unit type or product group?
Yes. A step price supports the same conditions as a standard charge price for its charge type. Only the Quantity and Price are replaced by the tiers.
Why was no step charge raised?
Why was no step charge raised?
Check that the total quantity falls within one of your tiers (see the warning under Tier rules). For pick charges, also check that every pick task on the pick list has been completed or cancelled. For flat-tier rental charges, the line is created only when the charge window closes. For other causes, see No charge applied.